Home Renovation & Flat Remodelling in Mumbai

In a 1980s Mumbai flat, the renovation budget is decided by what is behind the walls — and nobody finds that out by looking at the floor plan.

30%Contingency we advise
1Project manager
FreeSite survey

Free site visit for Home Renovation

Measured survey, 3D concept and an itemised quote — at no cost.

No cost, no obligation. We call back within 2 working hours, or reach us on WhatsApp.

What is involved

What home renovation actually involves

Renovating an older Mumbai flat is a different proposition from fitting out a new one. The concealed plumbing is likely GI and may be at the end of its life. The wiring is often aluminium, sized for a load nobody imagined in 1985. The brickwork behind the tiles may have been cut into by three previous owners.

None of this shows on a floor plan, and none of it appears in a quotation prepared from one. It appears on day four, when the tiles come off. The way to handle it is not to hope — it is to open up the critical areas during the survey, price the known work properly, and agree in advance how the unknowns get decided.

Our approach

Our survey includes opening up at least one wet-area wall and one electrical point so we are quoting against what is actually there. We check the incoming water line material, the distribution board capacity, and the drain stack condition. Society rules — working hours, lift usage, debris removal, permitted days — are confirmed in writing before we price. The quotation separates known scope from a named provisional allowance, and anything discovered is priced and approved by you in writing before it proceeds.

Common problems we are called for

  • GI plumbing discovered mid-project, adding weeks and a cost nobody budgeted
  • Aluminium wiring that cannot carry the new AC and hob load safely
  • Society permission refused or restricted after work has already started
  • Debris removal charged as an extra because nobody confirmed the society's rule
  • Five separate contractors with no sequencing, each waiting on the previous one
What you get

What you get from doing this properly

▦

We open up before quoting

At least one wet wall and one electrical point opened during the survey, not on day four.

☰

Society rules in writing

Hours, lift access, debris and permitted days confirmed before the price is given.

⏱

One sequenced schedule

Civil, plumbing, electrical, carpentry, ceiling and paint under one project manager.

⚠

Unknowns handled openly

Named provisional sums, and nothing proceeds without your written approval.

Our process

How we run a home renovation project

Free site survey

Measured survey plus opening up a wet wall and an electrical point to see what is actually there.

Services assessment

Incoming line material, DB capacity, drain stack condition and load calculation.

Society clearance check

Working hours, lift rules, debris removal and permitted days confirmed in writing.

Itemised quotation

Known scope priced line by line, with provisional sums named separately for the unknowns.

Phased execution

Demolition, plumbing, electrical, civil, carpentry, ceiling, paint — sequenced with dates.

Snagging and handover

Joint walk-through, snag list closed in writing, all warranties and documents handed over.

Specification

What goes into the specification

We name every material by type and grade in the quotation, and hand over documentation at completion. No unbranded line items.

PlumbingCPVC for hot and cold distribution, UPVC for drainage, pressure tested before concealment
ElectricalCopper, ISI marked, load calculated; separate circuits for AC, hob, geyser and lighting
WaterproofingBathroom floors and 600 mm up walls treated before tiling, flood tested for 48 hours
CivilDebris removed daily per society rules; dust barriers at every door to occupied areas
Timeline2BHK full renovation 60 to 90 days depending on the extent of the services work
ContingencyWe advise holding 25 to 30% above the quoted figure on any flat older than 25 years

Sometimes the services work is the whole job

We have surveyed flats where the honest recommendation was to spend the entire budget on replacing the plumbing and the wiring, and leave the finishes alone for two years. New marble over a failing GI line is money you will dig up again. If that is what your flat needs, we will say it even though it is the less interesting job.

Client feedback

What clients say

★★★★★

They opened up the bathroom wall during the survey and showed me the GI pipe, which told us the real scope before I had committed to anything. The quote was higher than the others and it was the only honest one.

Zoya Merchant2BHK, Santacruz West
Answers

Home Renovation — frequently asked questions

How much does renovating a flat in Mumbai cost?

The finishes are the predictable part. The variable is the services — plumbing, wiring and waterproofing — and in a flat over 25 years old that can be a third of the total. We open up during the survey precisely so the number we give you is based on what is there. We also advise holding 25 to 30% contingency on older buildings, and we would rather say that upfront than discover it with you later.

Do I need to move out?

For a full renovation, yes — typically 60 to 90 days for a 2BHK. Phasing it room by room so you can stay is possible and we do it, but it adds roughly 30 to 40% to the timeline because trades cannot run in parallel and the flat has to be made safe each evening.

Who handles the society permission?

We confirm the rules in writing and prepare the application, including the contractor details and insurance the society will ask for. The application and the deposit stay in the flat owner's name, which is what societies require.

What happens if you find something unexpected?

It is priced and sent to you in writing before any work on it proceeds. Nothing gets done and invoiced afterwards. The quotation names provisional sums for the things we think are likely, so most discoveries are already allowed for rather than being a surprise.

Can you renovate just the bathrooms or just the kitchen?

Yes, and it is often the sensible place to start. Those are the two rooms where concealed services fail and where the cost of doing it twice is highest. A single bathroom typically runs 18 to 25 days including waterproofing and the flood test.

Request a quote for Home Renovation

Get a free site visit this week

A designer visits, measures, and gives you a written scope and an itemised quotation before any price is discussed.