Distribution Board & Panel Work
A board that trips every evening is usually not faulty. It is undersized for what has been added to it.
Free site visit
Measured survey and an itemised quote, at no cost.
About db & panel work
Upgrading the board and splitting the circuits often solves a tripping problem without a full rewire, at a fraction of the cost. The load calculation establishes whether that is the case or whether the wiring itself is the constraint.
What we specify
How we run the work
Free site visit
Existing DB inspected, wiring material identified, points counted and condition assessed.
Load calculation
Every appliance listed and totalled with diversity, to size the cable and the board.
Circuit plan
Separate circuits for AC, kitchen, geyser and lighting, drawn before any chasing starts.
Itemised quotation
Points, circuits, DB, wire brand and gauge, and switch range each priced separately.
DB & Panel Work — questions
Will a new board stop the tripping?
If the wiring is sound copper and the problem is board capacity or circuit sharing, yes — and it costs a fraction of a rewire. If the wiring itself is undersized or aluminium, the board alone will not fix it. The load calculation tells us which.
How long does a board upgrade take?
One to two days including testing, with the power off for most of that. We schedule it so the flat is not without power overnight.
Other electrical contractor services
House Wiring
Wiring is sized from the load, and the load is something you add up rather than estimate.
Read more →Rewiring
Most Mumbai flats built before 1995 were wired for a fan, a tube light and a television.
Read more →Home Automation
Automation decisions have to be made at first fix. Retrofitting means opening finished walls.
Read more →